Statement of Work — OpenClaw Deployment
Client: Jed ________________ Vendor: Anthony ________________ & Partner Date: April 20, 2026 Ventures in scope: Shred with Jed · FFF Dog Wellness · Floor Cleaning Authority Deferred: CCFC (maintenance only, not in this SOW)
Objective
Deploy a closed-environment AI operating system on Jed's Mac Studio M5 that runs three siloed "CEO" agents — each with its own persona, memory, and mission — so Jed owns his autonomous workforce instead of renting one. Zero data leaves the M5 except to business APIs Jed explicitly whitelists.
Phase 1 — Foundation · Weeks 1–2 · $[_____]
Deliverables
- Mac Studio M5 provisioned: Ollama, Hermes 4 70B (CEO tier), Qwen 2.5 14B (worker tier), Nomic embeddings
- Runtime: Claude Code 2.0 + Agent SDK + MCP; memory artifacts use OpenClaw/Hermes conventions so the runtime stays portable
- Benchmark report: tokens/sec per model, RAM/VRAM headroom
~/openclaw/directory scaffolded with three siloed venture folders + LanceDB per venture- Security baseline: Little Snitch whitelist rules,
age-encrypted.env, Skill Guard installed - Git repo + Time Machine + encrypted offsite backup — verified by a restore test
- Handover doc: "Your Brain Lives Here" (1 page)
Acceptance test: Jed runs openclaw status and sees three green venture silos, backup restore passes, firewall blocks a test unauthorized outbound call.
Phase 2 — Persona & Deep Learning · Weeks 3–4 · $[_____]
Deliverables
- Three co-authored SOUL files:
SOUL.md,identity.md,mission.mdper venture (Shred, FFF, Floor) - Brand
DESIGN.mdper venture, seeded from theawesome-claude-design68-pack, locked to Claude Design (Opus 4.7) - Plaud Note backlog ingested → indexed in LanceDB per venture
- Top-20 influencer scrape complete per vertical (fitness, dog wellness, carpet cleaning) with hook + structure analysis stored as
lessons.md - Daily log pipeline (
daily-log.jsonl) writing to each venture silo - Five sample outputs per CEO reviewed with Jed
Acceptance test: Jed signs off that each CEO's sample output sounds like him on his best day, not generic AI, and the three DESIGN.md previews match each brand's feel.
Phase 3 — Mission Control + Go Live · Weeks 5–6 · $[_____]
Deliverables
- Local Mission Control at
localhost:3000: Kanban, Calendar, Approval Queue, Memory Browser, per-CEO logs — built around Claude Code 2.0 native views where they exist, custom Next.js only for the gaps - Telegram approval bot on Jed's phone
- Three CEO agents scheduled and running, output gated by the Approval Queue
- MCP servers installed + Skill-Guarded: Plaud, Playwright, Canva, Claude Design, Monitor (background-process triggers), Video Edit (Remotion /
buttercut); Shopify added when FFF store launches - Overnight experiment loop per CEO (Karpathy-style
autoresearch): A/B tests hooks, thumbnails, subject lines, price points; ranked winners land in the Approval Queue every morning - Two 90-minute training sessions: dashboard walkthrough + "how to add a skill safely"
- Operator's playbook: rollback a persona, pause a CEO, read a log, review overnight experiment winners
Acceptance test: Jed, unassisted, approves one post per CEO from his phone, adds a scheduled task via the Kanban, rolls back a test persona change, and reviews one overnight experiment winner.
Phase 4 — Retainer · Monthly · $[_____]/mo
Included
- Weekly health check (model updates, skill updates, log review)
- Persona tuning from Jed's feedback
- Up to two new MCP skills per month (scan, install, document)
- Emergency response within 24 hrs
- Monthly summary report of what each CEO produced
Not included (quoted separately if needed)
- New venture onboarding (each new CEO = its own mini-SOW)
- Shopify store design / product photography
- Paid ad campaigns / media buying
- Third-party subscriptions (Canva, Shopify, Plaud, Telegram)
Engagement Rules
- SOUL files are co-authored. Vendor facilitates; Jed decides the voice.
- Approval Queue gates all external posts for 60 days. Protects Jed's reputation during deep-learning phase.
- Skill installs go through vendor during the engagement. Jed can browse Claw Hub; vendor scans + installs.
- Ventures are onboarded sequentially: Shred first, FFF second, Floor Cleaning third. No parallel chaos.
- Change requests are written addenda with their own price and timeline.
Payment Terms
- 50% deposit per phase on kickoff, 50% on signed acceptance test
- Retainer billed first of each month, 30-day cancellation
- All work product delivered to Jed's M5 is Jed's property at acceptance
Signatures
Client: __________________________ Date: __________
Vendor: __________________________ Date: __________
Prepared for the meeting on April 21, 2026. This SOW supersedes any prior informal scope discussion.